Recovery Plan
This is an individual project Select a company below.1. using the attached template, prepare a Disaster Recovery Plan. Instructions are on the first page of the Disaster Recovery template.2. prepare a diagram of your disaster recovery solution.List of Companies:
- Time Warner
- Aetna
- American Express
- Nike
- Macys
- Toys R Us
- Computershare
- DirectTV
- UPS
- Johnson & Johnson
- Fidelity Investments
Post your disaster recovery plan and diagram of your disaster recovery solution in PDF’s in the Discussion Board.Grading – 25 Points broken down as follows:- 20 Points – Contents of Disaster Recovery Plan- 5 Points – Disaster Recovery Solution Diagram
>
<
b
>
I
n
t
r
o
d
u
ct
i
on
Dis
a
st
e
rRecovery Plans (DRP) are co
m
plex documents that contain a wealth of information about the I
T
operations of an enterprise and yet must present that information in a format that is easily consumable during an actual emergency. This template is one example of how to capture and organize the necessary information to ensure that the enterprise is in a position to survive if a disaster occurs.
This template contains instructional text. Please review all instructional text to ensure complete understanding of the purpose of each document section and follow those instructions to complete the section in question. This template also contains example text (presented as italicized grey text, such as this). These examples exist to provide guidance as to how to complete a section and supplement the information provided in the instructional text. In some cases example text (e.g. bullet lists) may be used as-is, added to, or deleted from while in other cases (e.g. sample table entries) it should be replaced with accurate, enterprise specific information.
This template is as complete as possible. As a result, for some organizations the document is more thorough than required. In those circumstances it is entirely appropriate to delete entire sections. To provide guidance as to which sections most likely need to be retained versus those that can be eliminated, the following color-coded text is used:
M
andatory – it is likely that all enterprises will need to complete this section.
Elective – it is possible that only some enterprises will need to complete this section.
Finally, this template also includes markers where you may wish to use a Find and Replace function to insert the name of the company, the name of partner companies and other such information. These fields are delineated with double angle brackets (such as <
Instructions
Complete all required sections and delete all unnecessary sections, replacing example text and Find and Replace text during the process. Upon completion of all sections, delete all instructional text (including this instruction page) as well as all Mandatory/Elective markers and Find and Replace markers. Update the Table of Contents (right click and select “Update Fields”).
Once this document is completed, post it in pdf format in the Discussion Board (Company Name,
S
tudent Names).
<
Date:
Version
1
Table of Contents
Introduction
Definition of a Disaster
1
Purpose
1
Scope
Version Information & Changes
2
Disaster Recovery Teams & Responsibilities
3
Disaster Recovery
L
ead
4
Disaster Management Team
5
Facilities Team
6
Network Team
7
Server Team
8
Applications Team
9
Operations Team
10
Senior Management Team
11
Communication Team
12
Finance Team
13
Other Organization Specific Teams
14
Disaster Recovery Call Tree
15
Recovery Facilities
18
Description of Recovery Facilities
18
Transportation to the Standby Facility
20
Operational Considerations
22
Data and Backups
24
Communicating During a Disaster
25
Communicating with the Authorities
25
Communicating with Employees
26
Communicating with Clients
27
Communicating with Vendors
28
Communicating with the Media
29
Communicating with <>
30
Dealing with a Disaster
31
Disaster Identification and Declaration
31
DRP Activation
32
Communicating the Disaster
32
Assessment of Current and Prevention of Further Damage
32
Standby Facility Activation
33
Restoring IT Functionality
33
Repair & Rebuilding of Primary Facility
34
Other Organization Specific Steps Required
34
Restoring IT Functionality
35
Current System Architecture
35
IT Systems
35
Plan Testing & Maintenance
41
Maintenance
41
Testing
41
Call Tree Testing
42
Introduction
Mandatory
This Disaster Recovery Plan (DRP) captures, in a single repository, all of the information that describes <
This section should be completed by all organizations. It helps position the DRP, detailing what is included in the plan and what areas are addressed. Edit this section to suit your organization’s needs, lists and paragraphs should be made relevant to your organization.
Definition of a Disaster
Elective
A disaster can be caused by man or nature and results in <
·
Edit this list to reflect your organization
· One or more vital systems are non-functional
· The building is not available for an extended period of time but all systems are functional within it
· The building is available but all systems are non-functional
· The building and all systems are non functional
The following events can result in a disaster, requiring this Disaster Recovery document to be activated:
· Edit this list to reflect your organization
· Fire
· Flash flood
· Pandemic
· Power Outage
· War
· Theft
· Terrorist Attack
Purpose
Mandatory
The purpose of this DRP document is twofold: first to capture all of the information relevant to the enterprise’s ability to withstand a disaster, and second to document the steps that the enterprise will follow if a disaster occurs.
No
te that in the event of a disaster the first priority of <
After all individuals have been brought to safety, the next goal of <
· Edit this list to reflect your organization
· Preventing the loss of the organization’s resources such as hardware, data and physical IT assets
· Minimizing downtime related to IT
· Keeping the business running in the event of a disaster
This DRP document will also detail how this document is to be maintained and tested.
Scope
Mandatory
The <
· Edit this list to reflect your organization
· Network Infrastructure
· Servers Infrastructure
· Telephony System
· Data Storage and Backup Systems
· Data Output Devices
· End-user Computers
· Organizational Software Systems
· Database Systems
· IT Documentation
This DRP does not take into consideration any non-IT, personnel, Human Resources and real estate related disasters. For any disasters that are not addressed in this document, please refer to the business continuity plan created by <
Version Information & Changes
Mandatory
Any changes, edits and updates made to the DRP will be recorded in here. It is the responsibility of the Disaster Recovery Lead to ensure that all existing copies of the DRP are up to date. Whenever there is an update to the DRP, <
Add rows as required as the DR Plan is amended.
Name of Person Making Change
Role of Person Making Change
Date of Change
Version Number
Notes
John Smith
DR Lead
01/01/09
1.0
Initial version of DR Plan
John Smith
DR Lead
01/01/10
2.0
Revised to include new standby facilities
Fred Jones
CEO
01/03/10
2.1
Replaced John Smith as DR Lead
Disaster Recovery Teams & Responsibilities
Mandatory
In the event of a disaster, different groups will be required to assist the IT department in their effort to restore normal functionality to the employees of <
· Edit this list to reflect your organization
· Disaster Recovery Lead(s)
· Disaster Management Team
· Facilities Team
· Network Team
· Server Team
· Applications Team
· Operations Team
· Management Team
· Communications Team
· Finance Team
The lists of roles and responsibilities in this section have been created by <
Please note that the following teams will vary depending on the size of your organization. Some teams/roles may be combined or may be split into more than one team.
Disaster Recovery Lead
Mandatory
The Disaster Recovery Lead is responsible for making all decisions related to the Disaster Recovery efforts. This person’s primary role will be to guide the disaster recovery process and all other individuals involved in the disaster recovery process will report to this person in the event that a disaster occurs at <
Role and Responsibilities
· Edit this list to reflect your organization
· Make the determination that a disaster has occurred and trigger the DRP and related processes.
· Initiate the DR Call Tree.
· Be the single point of contact for and oversee all of the DR Teams.
· Organize and chair regular meetings of the DR Team leads throughout the disaster.
· Present to the Management Team on the state of the disaster and the decisions that need to be made.
· Organize, supervise and manage all DRP test and author all DRP updates.
Contact Information
Contact Information
Contact Information
Contact Information
Contact Information
Add or delete rows to reflect the size the Disaster Recovery Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
Primary Disaster Lead
111-222-3333
111-222-3333
111-222-3333
Fred Jones
Secondary Disaster Lead
111-222-3333
111-222-3333
111-222-3333
Disaster Management Team
Elective
The Disaster Management Team that will oversee the entire disaster recovery process. They will be the first team that will need to take action in the event of a disaster. This team will evaluate the disaster and will determine what steps need to be taken to get the organization back to business as usual.
Please note than in a small organization, these roles may be performed by the Disaster Recovery Lead.
Role & Responsibilities
Role & Responsibilities
· Edit this list to reflect your organization
· Set the DRP into motion after the Disaster Recovery Lead has declared a disaster
· Determine the magnitude and class of the disaster
· Determine what systems and processes have been affected by the disaster
· Communicate the disaster to the other disaster recovery teams
· Determine what first steps need to be taken by the disaster recovery teams
· Keep the disaster recovery teams on track with pre-determined expectations and goals
· Keep a record of money spent during the disaster recovery process
· Ensure that all decisions made abide by the DRP and policies set by <
· Get the secondary site ready to restore business operations
· Ensure that the secondary site is fully functional and secure
· Create a detailed report of all the steps undertaken in the disaster recovery process
· Notify the relevant parties once the disaster is over and normal business functionality has been restored
· After <
Contact Information
Add or delete rows to reflect the size the Disaster Management Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
“Normal” title
111-222-3333
111-222-3333
111-222-3333
Fred Jones
“Normal” title
111-222-3333
111-222-3333
111-222-3333
Facilities Team
Mandatory
The Facilities Team will be responsible for all issues related to the physical facilities that house IT systems. They are the team that will be responsible for ensuring that the standby facilities are maintained appropriately and for assessing the damage too and overseeing the repairs to the primary location in the event of the primary location’s destruction or damage.
Role & Responsibilities
· Edit this list to reflect your organization
· Ensure that the standby facility is maintained in working order
· Ensure that transportation is provided for all employees working out of the standby facility
· Ensure that hotels or other sleeping are arranged for all employees working out of the standby facility
· Ensure that sufficient food, drink, and other supplies are provided for all employees working out of the standby facility
· Assess, or participate in the assessment of, any physical damage to the primary facility
· Ensure that measures are taken to prevent further damage to the primary facility
· Work with insurance company in the event of damage, destruction or losses to any assets owned by <
· Ensure that appropriate resources are provisioned to rebuild or repair the main facilities in the event that they are destroyed or damaged
· After <
Contact Information
Add or delete rows to reflect the size of the Facilities Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
VP Facilities
111-222-3333
111-222-3333
111-222-3333
Fred Jones
Standby Facility Manager
111-222-3333
111-222-3333
111-222-3333
Network Team
Mandatory
The Network Team will be responsible for assessing damage specific to any network infrastructure and for provisioning data and voice network connectivity including WAN, LAN, and any telephony connections internally within the enterprise as well as telephony and data connections with the outside world. They will be primarily responsible for providing baseline network functionality and may assist other IT DR Teams as required.
Role & Responsibilities
· Edit this list to reflect your organization
· In the event of a disaster that does not require migration to standby facilities, the team will determine which network services are not functioning at the primary facility
· If multiple network services are impacted, the team will prioritize the recovery of services in the manner and order that has the least business impact.
· If network services are provided by third parties, the team will communicate and co-ordinate with these third parties to ensure recovery of connectivity.
· In the event of a disaster that does require migration to standby facilities the team will ensure that all network services are brought online at the secondary facility
· Once critical systems have been provided with connectivity, employees will be provided with connectivity in the following order:
· All members of the DR Teams
· All C-level and Executive Staff
· All IT employees
· All remaining employees
· Install and implement any tools, hardware, software and systems required in the standby facility
· Install and implement any tools, hardware, software and systems required in the primary facility
· After <
Contact Information
Add or delete rows to reflect the size of the Network Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
Network Manager
111-222-3333
111-222-3333
111-222-3333
Fred Jones
Network Administrator
111-222-3333
111-222-3333
111-222-3333
Server Team
Mandatory
The Server Team will be responsible for providing the physical server infrastructure required for the enterprise to run its IT operations and applications in the event of and during a disaster. They will be primarily responsible for providing baseline server functionality and may assist other IT DR Teams as required.
Role & Responsibilities
· Edit this list to reflect your organization
· In the event of a disaster that does not require migration to standby facilities, the team will determine which servers are not functioning at the primary facility
· If multiple servers are impacted, the team will prioritize the recovery of servers in the manner and order that has the least business impact. Recovery will include the following tasks:
· Assess the damage to any servers
· Restart and refresh servers if necessary
· Ensure that secondary servers located in standby facilities are kept up-to-date with system patches
· Ensure that secondary servers located in standby facilities are kept up-to-date with application patches
· Ensure that secondary servers located in standby facilities are kept up-to-date with data copies
· Ensure that the secondary servers located in the standby facility are backed up appropriately
· Ensure that all of the servers in the standby facility abide by <
·
Install and implement any tools, hardware, and systems required in the standby facility
· Install and implement any tools, hardware, and systems required in the primary facility
· After <
Contact Information
Add or delete rows to reflect the size of the Server Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
Operations Manager
111-222-3333
111-222-3333
111-222-3333
Fred Jones
Systems Administrator
111-222-3333
111-222-3333
111-222-3333
Applications Team
Mandatory
The Applications Team will be responsible for ensuring that all enterprise applications operates as required to meet business objectives in the event of and during a disaster. They will be primarily responsible for ensuring and validating appropriate application performance and may assist other IT DR Teams as required.
Role & Responsibilities
· Edit this list to reflect your organization
· In the event of a disaster that does not require migration to standby facilities, the team will determine which applications are not functioning at the primary facility
· If multiple applications are impacted, the team will prioritize the recovery of applications in the manner and order that has the least business impact. Recovery will include the following tasks:
· Assess the impact to application processes
· Restart applications as required
· Patch, recode or rewrite applications as required
· Ensure that secondary servers located in standby facilities are kept up-to-date with application patches
· Ensure that secondary servers located in standby facilities are kept up-to-date with data copies
· Install and implement any tools, software and patches required in the standby facility
· Install and implement any tools, software and patches required in the primary facility
· After <
Contact Information
Add or delete rows to reflect the size of the Application Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
Program Manager
111-222-3333
111-222-3333
111-222-3333
Fred Jones
Systems Administrator
111-222-3333
111-222-3333
111-222-3333
Operations Team
Mandatory
This team’s primary goal will be to provide employees with the tools they need to perform their roles as quickly and efficiently as possible. They will need to provision all <
Role & Responsibilities
· Edit this list to reflect your organization
· Maintain lists of all essential supplies that will be required in the event of a disaster
· Ensure that these supplies are provisioned appropriately in the event of a disaster
· Ensure sufficient spare computers and laptops are on hand so that work is not significantly disrupted in a disaster
· Ensure that spare computers and laptops have the required software and patches
· Ensure sufficient computer and laptop related supplies such as cables, wireless cards, laptop locks, mice, printers and docking stations are on hand so that work is not significantly disrupted in a disaster
· Ensure that all employees that require access to a computer/laptop and other related supplies are provisioned in an appropriate timeframe
· If insufficient computers/laptops or related supplies are not available the team will prioritize distribution in the manner and order that has the least business impact
· This team will be required to maintain a log of where all of the supplies and equipment were used
· After <
Contact Information
Add or delete rows to reflect the size of the Operations Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
Helpdesk Manager
111-222-3333
111-222-3333
111-222-3333
Fred Jones
Systems Administrator
111-222-3333
111-222-3333
111-222-3333
Senior Management Team
Mandatory
The Senior Management Team will make any business decisions that are out of scope for the Disaster Recovery Lead. Decisions such as constructing a new data center, relocating the primary site etc. should be make by the Senior Management Team. The Disaster Recovery Lead will ultimately report to this team.
Role & Responsibilities
· Edit this list to reflect your organization
· Ensure that the Disaster Recovery
Team Lead
is help accountable for his/her role
· Assist the Disaster Recovery
Team Lead
in his/her role as required
· Make decisions that will impact the company. This can include decisions concerning:
· Rebuilding of the primary facilities
· Rebuilding of data centers
· Significant hardware and software investments and upgrades
· Other financial and business decisions
Contact Information
Add or delete rows to reflect the size of the Management Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
CEO
111-222-3333
111-222-3333
111-222-3333
Fred Jones
COO
111-222-3333
111-222-3333
111-222-3333
Communication Team
Elective
This will be the team responsible for all communication during a disaster. Specifically, they will communicate with <
Role & Responsibilities
· Edit this list to reflect your organization
· Communicate the occurrence of a disaster and the impact of that disaster to all <
· Communicate the occurrence of a disaster and the impact of that disaster to authorities, as required
· Communicate the occurrence of a disaster and the impact of that disaster to all <
· Communicate the occurrence of a disaster and the impact of that disaster to all <
· Communicate the occurrence of a disaster and the impact of that disaster to all <
· Communicate the occurrence of a disaster and the impact of that disaster to media contacts, as required
· After <
Contact Information
Add or delete rows to reflect the size of the Communications Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
VP HR
111-222-3333
111-222-3333
111-222-3333
Fred Jones
Media Relations
111-222-3333
111-222-3333
111-222-3333
Finance Team
Elective
This team will be responsible for ensuring that all of <
Role & Responsibilities
· Edit this list to reflect your organization
· Ensure there is sufficient cash on-hand or accessible to deal with small-scale expenses caused by the disaster. These can include paying for accommodations and food for DR team members, incremental bills, etc.
· Ensure there is sufficient credit available or accessible to deal with large-scale expenses caused by the disaster. These can include paying for new equipment, repairs for primary facilities, etc.
· Review and approve Disaster Teams’ finances and spending
· Ensure that payroll occurs and that employees are paid as normal, where possible
· Communicate with creditor to arrange suspension of extensions to scheduled payments, as required
· Communicate with banking partners to obtain any materials such as checks, bank books etc. that may need to be replaced as a result of the disaster
Contact Information
Add or delete rows to reflect the size of the Finance Team in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
John Smith
CFO
111-222-3333
111-222-3333
111-222-3333
Fred Jones
Controller
111-222-3333
111-222-3333
111-222-3333
Other Organization Specific Teams
Elective
Specify additional teams as required in your organization.
Define the team’s goals here.
Role & Responsibilities
· Edit this list to reflect your organization
· List of team’s roles and responsibilities
Contact Information
Add or delete rows to reflect the size of the Other Organization DR Teams in your organization.
Name
Role/Title
Work Phone Number
Home Phone Number
Mobile Phone Number
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
As Required
Disaster Recovery Call Tree
Mandatory
In a disaster recovery or business continuity emergency, time is of the essence so <
· The Disaster Recovery Team Lead calls all Level 1
Members
(Blue cells)
· Level 1 members call all Level 2 team members over whom they are responsible (Green cells)
· Level 1 members call all Level 3 team members over whom they are directly responsible (Beige cells)
· Level 2 Members call all Level 3 team members over whom they are responsible (Beige cells)
· In the event a team member is unavailable, the initial caller assumes responsibility for subsequent calls (i.e. if a Level 2 team member is inaccessible, the Level 1 team member directly contacts Level 3 team members).
Add as many levels as you need for your organization.
Contact
Office
Mobile
Home
DR Lead
John Smith
111-222-3333
111-222-3333
111-222-3333
DR Management Team Lead
DR Management Team 1
DR Management Team 2
Facilities Team Lead
Facilities Team 1
Network Team Lead
LAN Team Lead
LAN Team 1
WAN Team Lead
WAN Team 1
Server Team Lead
Server Type 1 Team Lead
Server Type 1 Team 1
Server Type 2 Team Lead
Server Type 2 Team 1
Applications Team Lead
App 1 Team Lead
App1 Team 1
App 2 Team Lead
App 2 Team 1
Management Team Lead
Management Team 1
Communications Team Lead
Communications Team 1
Finance Team Lead
Finance Team 1
A
Disaster Recovery Call Tree Process Flow
diagram can help clarify the call process in the event of an emergency. This sample may be used as-is or replaced with a custom flow process.
Recovery Facilities
Elective
In order to ensure that <
This section will vary depending on the type of standby facility that your organization uses. Please append this section according to the measures and facilities that your organization has in place. Some organizations may not have a standby facility at their disposal; in this situation, skip this section.
This section is currently populated by an example of a company with a dedicated standby facility.
Description of Recovery Facilities
Elective (Mandatory where facilities exist)
The Disaster Command and Control Center or Standby facility will be used after the Disaster Recovery Lead has declared that a disaster has occurred. This location is a separate location to the primary facility. The current facility, located at <
> is <The standby facility will be used by the IT department and the Disaster Recovery teams; it will function as a central location where all decisions during the disaster will be made. It will also function as a communications hub for <
The standby facility must always have the following resources available:
· Edit this list to reflect your organization
· Copies of this DRP document
· Fully redundant server room
· Sufficient servers and storage infrastructure to support enterprise business operations
· Office space for DR teams and IT to use in the event of a disaster
· External data and voice connectivity
· Sleeping quarters for employees that may need to work multiple shifts
· Kitchen facilities (including food, kitchen supplies and appliances)
· Bathroom facilities (Including toilets, showers, sinks and appropriate supplies)
· Parking spaces for employee vehicles
Map of Standby Facility Location
Provide a map of the area where the standby facility is located. Use sufficient scale that people can easily determine both where the facility is (not too small a scale) and how to get there (not too large a scale).
Example (From Google Maps):
Directions to Recovery Facility
Provide multiple ways of getting to the facility in the event that one of the roads is unavailable.
<
<
Transportation to the Standby Facility
Elective (Mandatory where facilities exist)
In the event of a disaster, only the Disaster Recovery Teams and select members of the IT department will work out of the standby facility. Since the standby facility is located <
Include only those transportation providers that are appropriate given the location of the Standby Facility.
Taxi Providers
Taxi Company 1
Address
Phone Number
<
<
Taxi Company 2
Address
Phone Number
<
<
Rental Car Providers
Rental Car Company 1
Address
Phone Number
<
<
Rental Car Company 2
Address
Phone Number
<
Travel Agent 1
Address
Phone Number
<
<
Travel Agent 2
Address
Phone Number
<
<
Airports
Airport 1
Address
Phone Number
<
<
Airport 2
Address
Phone Number
<
<
Operational Considerations
Elective (Mandatory where facilities exist)
If employees are required to stay at the Standby Facility for extended periods of time and require hotel accommodations, they will be provided by <
If employees are required to stay at the Standby Facility for extended periods of time and require food, it will be provided by <
While in the Standby Facility, employees must work under appropriate, sanitary and safe conditions. The Facilities team will be responsible for ensuring that this facility is kept in proper working order.
Include only those operations considerations providers that are appropriate given the facilities of the Standby Facility.
Accommodations
Hotel 1
Address
Phone Number
<
<
Hotel 2
Address
Phone Number
<
<
Food, Beverages and Other Supplies
Restaurant/Grocery 1
Address
Phone Number
<
<
Restaurant/Grocery 2
Address
Phone Number
<
<
Restaurant/Grocery 3
Address
Phone Number
<
<
Catering
Caterer 1
Address
Phone Number
<
<
Caterer 2
Address
Phone Number
<
<
Standby Facility Maintenance
Maintenance Company
Address
Phone Number
Data and Backups
Mandatory
This section explains where all of the organization’s data resides as well as where it is backed up to. Use this information to locate and restore data in the event of a disaster.
In this section it is important to explain where the organization’s data resides. Discuss the location of all the organization’s servers, backups and offsite backups and list what information is stored on each of these.
Data in Order of Criticality
Please list all of the data in your organization in order of their criticality. Add or delete rows as needed to the table below.
Rank
Data
Data Type
Back-up Frequency
Backup Location(s)
1
<>
<
<
<
2
4
5
6
7
8
9
10
Communicating During a Disaster
Mandatory
In the event of a disaster <
Communicating with the Authorities
Mandatory
The Communications Team’s first priority will be to ensure that the appropriate authorities have been notified of the disaster, providing the following information:
· Edit this list to reflect your organization
· The location of the disaster
· The nature of the disaster
· The magnitude of the disaster
· The impact of the disaster
· Assistance required in overcoming the disaster
· Anticipated timelines
Authorities Contacts
Add or delete rows to reflect the media contacts your enterprise must contact.
Authorities
Point of Contact
Phone Number
Police Department
<
111-222-3333
<
Fire Department
<
111-222-3333
<
Communicating with Employees
Mandatory
The Communications Team’s second priority will be to ensure that the entire company has been notified of the disaster. The best and/or most practical means of contacting all of the employees will be used with preference on the following methods (in order):
· Edit this list to reflect your organization
· E-mail (via corporate e-mail where that system still functions)
· E-mail (via non-corporate or personal e-mail)
· Telephone to employee home phone number
· Telephone to employee mobile phone number
The employees will need to be informed of the following:
· Edit this list to reflect your organization
· Whether it is safe for them to come into the office
· Where they should go if they cannot come into the office
· Which services are still available to them
· Work expectations of them during the disaster
Employee Contacts
Add or delete rows to reflect the employees in your organization.
Name
Role/Title
Home Phone Number
Mobile Phone Number
Personal E-mail Address
John Smith
Employee
111-222-3333
111-222-3333
jsmith@org.org
Fred Jones
Employee
111-222-3333
111-222-3333
fjones@org.org
Communicating with Clients
Mandatory
After all of the organization’s employees have been informed of the disaster, the Communications Team will be responsible for informing clients of the disaster and the impact that it will have on the following:
· Edit this list to reflect your organization
· Anticipated impact on service offerings
· Anticipated impact on delivery schedules
· Anticipated impact on security of client information
· Anticipated timelines
Crucial clients will be made aware of the disaster situation first. Crucial clients will be E-mailed first then called after to ensure that the message has been delivered. All other clients will be contacted only after all crucial clients have been contacted.
Crucial Clients
Mandatory
Add or delete rows to reflect the crucial clients your enterprise must contact.
Company Name
Point of Contact
Phone Number
<
<
111-222-3333
<
Secondary Clients
Elective
Add or delete rows to reflect the secondary clients your enterprise must contact.
Company Name
Point of Contact
Phone Number
<
<
111-222-3333
<
Communicating with Vendors
Mandatory
After all of the organization’s employees have been informed of the disaster, the Communications Team will be responsible for informing vendors of the disaster and the impact that it will have on the following:
· Edit this list to reflect your organization
· Adjustments to service requirements
· Adjustments to delivery locations
· Adjustments to contact information
· Anticipated timelines
Crucial vendors will be made aware of the disaster situation first. Crucial vendors will be E-mailed first then called after to ensure that the message has been delivered. All other vendors will be contacted only after all crucial vendors have been contacted.
Vendors encompass those organizations that provide everyday services to the enterprise, but also the hardware and software companies that supply the IT department. The Communications Team will act as a go-between between the DR Team leads and vendor contacts should additional IT infrastructure be required.
Crucial Vendors
Mandatory
Add or delete rows to reflect the crucial vendors your enterprise must contact.
Company Name
Point of Contact
Phone Number
<
<
111-222-3333
<
Secondary Vendors
Elective
Add or delete rows to reflect the secondary vendors your enterprise must contact.
Company Name
Point of Contact
Phone Number
<
<
111-222-3333
<
Communicating with the Media
Elective
After all of the organization’s employees have been informed of the disaster, the Communications Team will be responsible for informing media outlets of the disaster, providing the following information:
· Edit this list to reflect your organization
· An official statement regarding the disaster
· The magnitude of the disaster
· The impact of the disaster
· Anticipated timelines
Media Contacts
Add or delete rows to reflect the media contacts your enterprise must contact.
Company Name
Point of Contact
Phone Number
<
<
111-222-3333
<
Communicating with <
Elective
Specify additional contacts as required in your organization.
Define the contact, the circumstances under which they are contacted, and the information that is communicated here.
Other Contacts
Add or delete rows to reflect the other contacts your enterprise must contact.
Company Name
Point of Contact
Phone Number
<
<
111-222-3333
<
Dealing with a Disaster
Mandatory
If a disaster occurs in <
Regardless of the category that the disaster falls into, dealing with a disaster can be broken down into the following steps:
· Edit this list to reflect your organization
1) Disaster identification and declaration
2) DRP activation
3) Communicating the disaster
4) Assessment of current and and prevention of further damage
5) Standby facility activation
6) Establish IT operations
7) Repair and rebuilding of primary facility
Disaster Identification and Declaration
Mandatory
Since it is almost impossible to predict when and how a disaster might occur, <
· Edit this list to reflect your organization
· First hand observation
· System Alarms and Network Monitors
· Environmental and Security Alarms in the Primary Facility
· Security staff
· Facilities staff
· End users
· 3rd Party Vendors
· Media reports
Once the Disaster Recovery Lead has determined that a disaster had occurred, s/he must officially declare that the company is in an official state of disaster. It is during this phase that the Disaster Recovery Lead must ensure that anyone that was in the primary facility at the time of the disaster has been accounted for and evacuated to safety according to the company’s Evacuation Policy.
While employees are being brought to safety, the Disaster Recovery Lead will instruct the Communications Team to begin contacting the Authorities and all employees not at the impacted facility that a disaster has occurred.
DRP Activation
Mandatory
Once the Disaster Recovery Lead has formally declared that a disaster has occurred s/he will initiate the activation of the DRP by triggering the Disaster Recovery Call Tree. The following information will be provided in the calls that the Disaster Recovery Lead makes and should be passed during subsequent calls:
· Edit this list as required
· That a disaster has occurred
· The nature of the disaster (if known)
· The initial estimation of the magnitude of the disaster (if known)
· The initial estimation of the impact of the disaster (if known)
· The initial estimation of the expected duration of the disaster (if known)
· Actions that have been taken to this point
· Actions that are to be taken prior to the meeting of Disaster Recovery Team
Leads
· Scheduled meeting place for the meeting of Disaster Recovery Team Leads
· Scheduled meeting time for the meeting of Disaster Recovery Team Leads
· Any other pertinent information
If the Disaster Recovery Lead is unavailable to trigger the Disaster Recovery
Call Tree,
that responsibility shall fall to the Disaster Management Team Lead
Communicating the Disaster
Refer to the “Communicating During a Disaster” section of this document.
Assessment of Current and Prevention of Further Damage
Mandatory
Before any employees from <
The first team that will be allowed to examine the primary facilities once it has been deemed safe to do so will be the Facilities Team. Once the Facilities Team has completed an examination of the building and submitted its report to the Disaster Recovery Lead, the Disaster Management, Networks, Servers, and Operations Teams will be allowed to examine the building. All teams will be required to create an initial report on the damage and provide this to the Disaster Recovery Lead within <
During each team’s review of their relevant areas, they must assess any areas where further damage can be prevented and take the necessary means to protect <
Standby Facility Activation
Mandatory
The Standby Facility will be formally activated when the Disaster Recovery Lead determines that the nature of the disaster is such that the primary facility is no longer sufficiently functional or operational to sustain normal business operations.
Once this determination has been made, the Facilities Team will be commissioned to bring the Standby Facility to functional status after which the Disaster Recovery Lead will convene a meeting of the various Disaster Recovery Team Leads at the Standby Facility to assess next steps. These next steps will include:
· Edit this list to reflect your organization
1. Determination of impacted systems
2. Criticality ranking of impacted systems
3. Recovery measures required for high criticality systems
4. Assignment of responsibilities for high criticality systems
5. Schedule for recovery of high criticality systems
6. Recovery measures required for medium criticality systems
7. Assignment of responsibilities for medium criticality systems
8. Schedule for recovery of medium criticality systems
9. Recovery measures required for low criticality systems
10. Assignment of responsibilities for recovery of low criticality systems
11. Schedule for recovery of low criticality systems
12. Determination of facilities tasks outstanding/required at Standby Facility
13. Determination of operations tasks outstanding/required at Standby Facility
14. Determination of communications tasks outstanding/required at Standby Facility
15. Determination of facilities tasks outstanding/required at Primary Facility
16. Determination of other tasks outstanding/required at Primary Facility
17. Determination of further actions to be taken
During Standby Facility activation, the Facilities, Networks, Servers, Applications, and Operations teams will need to ensure that their responsibilities, as described in the “Disaster Recovery Teams and Responsibilities” section of this document are carried out quickly and efficiently so as not to negatively impact the other teams.
Restoring IT Functionality
Mandatory
Refer to the “Restoring IT Functionality” section of this document.
Repair & Rebuilding of Primary Facility
Elective
Before the enterprise can return operations to Primary Facilities, those facilities must be returned to an operable condition. The tasks required to achieve that will be variable depending on the magnitude and severity of the damage. Specific tasks will be determined and assigned only after the damage to Primary Facilities has been assessed.
Other Organization Specific Steps Required
Elective
Explain the steps to be taken
Restoring IT Functionality
Mandatory
Should a disaster actually occur and <
This section will contain all of the information needed for the organization to get back to its regular functionality after a disaster has occurred. It is important to include all Standard Operating Procedures documents, run-books, network diagrams, software format information etc. in this section.
Current System Architecture
Mandatory
In this section, include a detailed system architecture diagram. Ensure that all of the organization’s systems and their locations are clearly indicated.
<
IT Systems
Mandatory
Please list all of the IT Systems in your organization in order of their criticality. Next, list each system’s components that will need to be brought back online in the event of a disaster. Add or delete rows as needed to the table below.
Rank
IT System
System Components (In order of importance)
1
9
Criticality Rank-One System
In this section you will be required to rank each system’s components in order of criticality, supplying the information that each system will require to bring it back online. First, vendor and model information, serial numbers and other component specific information will be gathered. Next, you will be required to attach each component’s runbooks or Standard Operating Procedure (SOP) documents.
Each component must have a runbook or SOP document associated with it. If you do not have these documents for all components, please refer to the following Info-Tech Research Group notes for more information:
· SOP Research:
·
SOP 101: Standard Operating Procedures
·
How to Write an SOP
·
How to Implement SOPs
·
Step-by-Step SOP Template
·
Hierarchical SOP Template
·
Flowchart SOP Template
· Runbooks Research:
·
Don’t Run without Runbooks
·
Free IT Staff Time: Implement Runbook Automation
·
How to Start Building Runbooks
EXAMPLE:
System Name |
< |
Component Name |
< |
Vendor Name |
< |
Model Number |
< |
Serial Number |
< |
Recovery Time Objective |
< |
Recovery Point Objective |
< |
Title: Standard Operating Procedures for < |
Document No.: < |
Security Level: << Public, Restricted, or Departmental (the specific department is named).>> |
Effective Date: < |
|
SOP Author/Owner: |
SOP Approver: |
Review Date: < |
a) Purpose
This SOP outlines the steps required to restore operations of <
b) Scope
This SOP applies to the following components of <
· Edit this list to include all included components of the system in question
· Web server
· Web server software
· Application server
· Application server storage system
· Application server software
· Application server backup
· Database server
· Database server storage system
· Database server software
· Database server backup
· Client hardware
· Client software
c) Responsibilities
The following individuals are responsible for this SOP and for all aspects of the system to which this SOP pertains:
· Edit this list as required
· SOP Process: << SOP Owner>>
· Network Connectivity: <
· Server Hardware: <
· Server Software: <
· Client Connectivity: <
· Client Hardware: <
· Client Software: <
For details of the actual tasks associated with these responsibilities, refer to section h) of this SOP.
d) Definitions
This section defines acronyms and words not in common use:
· Edit this list as required
· Document No.: Number of the SOP document as defined by [insert numbering scheme]
· Effective Date: The date from which the SOP is to be implemented and followed
· Review Date: The date on which the SOP must be submitted for review and revision
· Security Level: Levels of security are categorized as Public, Restricted, or Departmental
· SOP: Standard Operating Procedure
e) Changes Since Last Revision
· Add to this list as required
· << Nature of change, date of change, individual making the change, individual authorizing the change>>
f) Documents/Resources Needed for this SOP
The following documents are required for this SOP:
· Add to this list as required
· Document
g) Related Documents
The following documents are related to this SOP and may be useful in the event of an emergency. Their documents below are hyperlinked to their original locations and copies are also attached in the appendix of this document:
· Add to this list as required
· Document
h) Procedure
The following are the steps associated with bringing <
Step |
Action |
Responsibility |
< |
< |
Criticality Rank-Two System
Repeat as above for as many systems as the enterprise makes use of.
Plan Testing & Maintenance
Mandatory
While efforts will be made initially to construct this DRP is as complete and accurate a manner as possible, it is essentially impossible to address all possible problems at any one time. Additionally, over time the Disaster Recovery needs of the enterprise will change. As a result of these two factors this plan will need to be tested on a periodic basis to discover errors and omissions and will need to be maintained to address them.
For more information on DRP Testing and Maintenance, please refer to the following Info-Tech Research Group solution set for more information:
·
Make Sure the DRP is Ready for a Disaster
Maintenance
Mandatory
The DRP will be updated <
Maintenance of the plan will include (but is not limited to) the following:
· Edit this list as required
1. Ensuring that call trees are up to date
2. Ensuring that all team lists are up to date
3. Reviewing the plan to ensure that all of the instructions are still relevant to the organization
4. Making any major changes and revisions in the plan to reflect organizational shifts, changes and goals
5. Ensuring that the plan meets any requirements specified in new laws
6. Other organizational specific maintenance goals
During the Maintenance periods, any changes to the Disaster Recovery Teams must be accounted for. If any member of a Disaster Recovery Team no longer works with the company, it is the responsibility of the Disaster Recovery Lead to appoint a new team member.
Testing
Mandatory
<
Select which method(s) your organization will employ to test the DRP
1) Walkthroughs- Team members verbally go through the specific steps as documented in the plan to confirm effectiveness, identify gaps, bottlenecks or other weaknesses. This test provides the opportunity to review a plan with a larger subset of people, allowing the DRP project manager to draw upon a correspondingly increased pool of knowledge and experiences. Staff should be familiar with procedures, equipment, and offsite facilities (if required).
2) Simulations- A disaster is simulated so normal operations will not be interrupted. Hardware, software, personnel, communications, procedures, supplies and forms, documentation, transportation, utilities, and alternate site processing should be thoroughly tested in a simulation test. However, validated checklists can provide a reasonable level of assurance for many of these scenarios. Analyze the output of the previous tests carefully before the proposed simulation to ensure the lessons learned during the previous phases of the cycle have been applied.
3) Parallel Testing- A parallel test can be performed in conjunction with the checklist test or simulation test. Under this scenario, historical transactions, such as the prior business day’s transactions are processed against preceding day’s backup files at the contingency processing site or hot site. All reports produced at the alternate site for the current business date should agree with those reports produced at the alternate processing site.
4) Full-Interruption Testing- A full-interruption test activates the total DRP. The test is likely to be costly and could disrupt normal operations, and therefore should be approached with caution. The importance of due diligence with respect to previous DRP phases cannot be overstated.
Any gaps in the DRP that are discovered during the testing phase will be addressed by the Disaster Recovery Lead as well as any resources that he/she will require.
Call Tree Testing
Elective
Testing of the call trees is normally a good idea. Feel free to omit this section if you feel that it is irrelevant.
Call Trees are a major part of the DRP and <
1) Disaster Recovery Lead initiates call tree and gives the first round of employees called a code word.
2) The code word is passed from one caller to the next.
3) The next work day all Disaster Recovery Team members are asked for the code word.
4) Any issues with the call tree, contact information etc will then be addressed accordingly.
_____________________________________________________
3
Disaster Recovery Call Tree Process Flow
T
e
a
m
L
e
a
d
S
u
b
T
e
a
m
L
e
a
d
T
e
a
m
M
e
m
b
e
r
I
n
i
t
i
a
t
i
o
n
DR Lead Initiates
Call Tree,
Contacts Team
Leads
Team Lead
Contacts
Sub
Team Lead
Team Lead
Available?
Sub Team Lead
Contacts Team
Members
Team Members
respond to DR
call-out
Sub
Team Lead
Available?
No
No
Yes
Yes
DR
Lead Contacts
Sub Team Leads
DR Lead or Team
Lead Contacts
Team Members
�
�
Disaster Recovery Call Tree Process Flow�
Team Member�
Sub
Team Lead�
Initiation
Team Lead�
DR Lead Initiates Call Tree, Contacts Team Leads
Team Lead Contacts Sub Team Lead
Team Lead Available?
Sub Team Lead Contacts Team Members
Team Members respond to DR call-out
Sub
Team Lead Available?
No
No
Yes
Yes
DR Lead Contacts Sub Team Leads
DR Lead or Team Lead Contacts Team Members