Scope Statement
Project Serial Number: Comment by Ric French: Page 123

Title of Project:

Start Date:
Finish Date:

Project Manager:

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Total Cost (+/- 10%):

ROI (+/- 10%):

Payback Point (+/- 10%):

Project Description:

Product Characteristics:

Product Scope:

Product Milestones:

Deliverable

Deadline

Who is responsible

Project Limits and Exclusions:

Success Criteria (Sponsor Acceptance Criteria):

Project Administration Scope:

Project Administration Milestones:

Deliverable

Deadline

Who is responsible

PM:

PM Signature

Funding Sponsor: (VP accountable for project)

Sponsor Signature

Page 1 of 2 

Scope Statement:  (Version 1) October 12, 2014            Project Serial Number: 0001 
Title of Project:  Work Shop  Start Date: January 19, 2015

Finish Date: March 20, 2015 

Project Manager:  x 
Total Cost (+/‐ 10%):  $12,000 

ROI (+/‐ 10%):  27%  Payback Point (+/‐ 10%):  < 2 years 

Project Description: A large 20’ x 20’ workshop for woodworking and welding.  An area behind x Inc. has been allocated
for this project.  The project will consist of site prep and leveling, concrete footings, stick frame with sub‐floor, roofing 
and siding, and electrical service.  Shop will have adequate electrical supply for lighting, welding equipment, and power 
tools.  Shop will include shelving, cabinets, and workbenches, as well as curtain walls to close off individual areas for 
sanding and painting when needed.  All interior work, including shelving and cabinetry, to be completed by X Inc. on an 
as needed basis and is not to be included in the timeline. 

Product Characteristics: This project will allow multiple tasks to be completed at one time by supplying separate work 
areas for different tasks.  The ability to close off one area from another, as well as having proper electrical supply to 
each area, is the main priority of this project.  The finished project shall consist of the following interior specs. 

1. A 10ft. by 10ft. area for welding to be curtained off by owner.
2. A 10ft. by 10ft. area for painting to be curtained off by owner.
3. A 10ft. by 20ft. area for cutting and assembly to be curtained off by owner.

There will be no drywall or insulation on the interior of this work shop. x Inc. will be responsible for curtain tracks, shield 
curtains, and any interior furniture needs. 

Product Scope:  The product scope for this project consists of two criteria.  First, all completed work must meet 
approval requirements of State and local inspectors. Second, all material used must have approval of the Quality Team 
Leader before installation.  A detailed WBS will be provided to further outline any other requirements. 

Product Milestones:

Deliverable  Deadline  Who is responsible

Foundation: This is to include finished site prep and footings. January 21, 2015  x 

Framing: This is to include the finished sub‐floor and structure. February 18, 2015  x 

Electrical: This is to include a 100 amp service panel and all required 
breakers, receptacles, and covers.  

March 2, 2015  x 

Rough‐In Inspection: This will include framing and electrical rough‐in. March 3, 2015  x 

Roofing and Siding: This is to include all underlayment, waterproofing for 
roof and walls, and finished siding. 

March 18, 2015  x 

Flooring: The flooring will be made of non‐pressure treated ¾ “plywood 
and fastened every 12” to sub‐floor per Duval County code requirements. 

March 19, 2015  x 

Final Inspection: It is the responsibility of each contractor to meet final 
inspection requirements within the agreed price constraints. 

March 20, 2015  x 

Project Limits and Exclusions:  All interior work, with the exception of electrical requirements, will be excluded as a 
success criterion for this project.  x will be responsible for all interior set‐up and design layout on an as needed basis. 

Success Criteria (Sponsor Acceptance Criteria): This project will be successful if a >90% increase in revenue is realized 
after one year of operation.  Any decrease of ordering costs or reduction of inventory should also be realized after one 
year. This project should also meet all regulatory requirements of both County and State regulating bodies.  Success of 
project shall include a finishing time of 2 months. 

Page 2 of 2 

Project Administration Scope: 

Project Administration Milestones:

Deliverable  Deadline Who is responsible

Safety Plan Requirements of X Designs Inc. 

 To be delivered to each contractor prior to
start of project.

January 19, 2015 x

Project Charter  January 19, 2015 x

Project Management Plan  January 19, 2015 x

Scope Statement  January 19, 2015 x

WBS  January 19, 2015 x

Communication Plan  January 19, 2015

PM:  x  PM Signature:  x 

Funding Sponsor: (VP accountable for project) 


Sponsor Signature:  x 

Calculate your order
Pages (275 words)
Standard price: $0.00
Client Reviews
4.9
Sitejabber
4.6
Trustpilot
4.8
Our Guarantees
100% Confidentiality
Information about customers is confidential and never disclosed to third parties.
Original Writing
We complete all papers from scratch. You can get a plagiarism report.
Timely Delivery
No missed deadlines – 97% of assignments are completed in time.
Money Back
If you're confident that a writer didn't follow your order details, ask for a refund.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Power up Your Academic Success with the
Team of Professionals. We’ve Got Your Back.
Power up Your Study Success with Experts We’ve Got Your Back.

Order your essay today and save 30% with the discount code ESSAYHELP