Construction Scheduling

Assignment 4

Q1. A project consists of replacing the track on an existing railroad line, involving 3,000 feet of

track. The old track can be removed at a rate of 70 feet per hour. The old railroad ties can be

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

removed at a rate of 200 feet (measured along the track) per hour. The new ties can be installed

at a rate of 25 feet per hour and the replacement track can be installed at a rate of 40 feet per

hour. Show this operation on a linear schedule. Assume that the minimum float for an activity at

any location is one day. 40 points

Q2. Describe a project that might not be well suited for linear scheduling. Please provide good

explanation of the project and the reasons why linear scheduling is not suitable for that project.

20 Points

Q3. Create a linear schedule for highway project 15 miles long considering following

information

(Please round to the nearest integer for duration in days). 40 points

Activity Productivity rate (miles/day) Time buffer (days)

Survey and

layout

2.5

Clear and Grub 0.75

1

Earthwork 0.36 for the first 5 mile

2 idle days

After the idle days, 1 miles for rest of the miles

1

Sub-base 1.0 17

Base 1.0 1

Paving 3 11

Signage 7.5 3

Resp

on

d

to

Discussion Responses

S M

Q1: Discuss what resources are most critical for most of the construction

 

projects and how to

incorporate

 

the information into

the schedule

?

There are many ways to make the schedule more effective and they are,

 

Project deliverables, Tasks

required to complete the deliverables, Dependencies between tasks, Resources required to complete

each task, Task durations and project deadline, Budget of th

e project, and Planned time for each

resource. As well, for incorporate the schedule by monitoring and controlling the

schedule and

estimate

the duration of each of the activities.

Respond

Q2: Discuss one

 

disadvantage

 

that you see in using a

 

linear schedule for a

 

multilevel

 

building

 

project?

The disadvantage of having a linear schedule for a multilevel building is that it will require to re

develop

  the schedule 

all the

time.

It becomes extremely detailed that making the network difficult for

the user to visualize

and manage even. The exact originals of graphical techniques are not clear and they

may have multiple original. As well, the limitation of linear scheduling method is that it assumes that

production rates are linear

Respond

M G

1. Discuss what resources are most critical for most of the constructi

on projects and how to incorporate

the information into the schedule?

To

complete an

activity,

the CM needs to ensure 3 elements are provided in a timely manner:

Human resources

Meaning the corresponding qualified team needs to enter the site

at the intended

time.

Equipment

Either the appropriate team or the CM must procure the equipment that will facilitate .

This not only refers to the power tools used for a

job

, but also refers to scaffolding, safety gear etc.

Materials

Meaning the actual construction materials used to build. This goes from steel and concrete

to carpentry, flooring, and light fixtures.

Respond

2. Discuss one disadvantage that you see in using a linear schedule for a multilevel building project ?

While multilevel building projects are indeed quite predictable and repetitive, often they are filled with

detailing. Other projects that typically employs Linear scheduling , such as highways and roads are heavy

on

structure but low on detailing such as

interior finishes, carpentry etc.

This causes many smaller tasks that come from a multilevel building that need to be registered and accounted for on the linear schedule, making the schedule to become flooded with activities.

This can me it hard to understand and confusing to a team member. The information may not be as easy to access because of the formatting of the chart, as opposed to say a Gantt chart.

Respond

G G

1. Discuss what the recourses are most critical for most of the construction projects and how to incorporate the information into the schedule?

Virtually all projects have limited capacity or resources. Therefore, the success of a project is tied to how well the resources are managed and how well the project is scheduled. The traditional methods of project scheduling have been either the Critical Path Method (CPM) or the Gantt Chart. However, Critical Path Analysis is limited in its assumption the project has infinite capacity. A new method of project scheduling has been proposed the incorporates finite capacity of labor. capital equipment, facilities, and material into its scheduling formula. Resource scheduling incorporates decisions about capacity into the scheduling process using two methods: 

Time: constrained and resources constrained. Time-constrained scheduling uses time factors as its critical variable, while resources-constrained focuses on the limited capacity of resources, with emphasis on resolving capacity overload problems.

Respond

Respond to

Discussion Responses

S M

Q1: Discuss what resources are most critical for most of the construction

projects and how to
incorporate

the information into the schedule?

There are many ways to make the schedule more effective and they are,

Project deliverables, Tasks
required to complete the deliverables, Dependencies between tasks, Resources required to complete
each task, Task durations and project deadline, Budget of th
e project, and Planned time for each
resource. As well, for incorporate the schedule by monitoring and controlling the
schedule and

estimate
the duration of each of the activities.

Respond

Q2: Discuss one

disadvantage

that you see in using a

linear schedule for a

multilevel

building

project?

The disadvantage of having a linear schedule for a multilevel building is that it will require to re

develop

the schedule

all the

time.

It becomes extremely detailed that making the network difficult for
the user to visualize

and manage even. The exact originals of graphical techniques are not clear and they
may have multiple original. As well, the limitation of linear scheduling method is that it assumes that
production rates are linear

Respond

M G

1. Discuss what resources are most critical for most of the constructi
on projects and how to incorporate
the information into the schedule?

To

complete an
activity,

the CM needs to ensure 3 elements are provided in a timely manner:

Human resources

Meaning the corresponding qualified team needs to enter the site

at the intended
time.

Equipment

Either the appropriate team or the CM must procure the equipment that will facilitate .
This not only refers to the power tools used for a
job
, but also refers to scaffolding, safety gear etc.

Materials

Meaning the actual construction materials used to build. This goes from steel and concrete
to carpentry, flooring, and light fixtures.

Respond

2. Discuss one disadvantage that you see in using a linear schedule for a multilevel building project ?

While multilevel building projects are indeed quite predictable and repetitive, often they are filled with
detailing. Other projects that typically employs Linear scheduling , such as highways and roads are heavy
on

structure but low on detailing such as
interior finishes, carpentry etc.

Respond to Discussion Responses

S M

Q1: Discuss what resources are most critical for most of the construction projects and how to

incorporate

the information into the schedule?

There are many ways to make the schedule more effective and they are, Project deliverables, Tasks

required to complete the deliverables, Dependencies between tasks, Resources required to complete

each task, Task durations and project deadline, Budget of the project, and Planned time for each

resource. As well, for incorporate the schedule by monitoring and controlling the schedule and estimate

the duration of each of the activities.

Respond

Q2: Discuss one disadvantage that you see in using a linear schedule for a multilevel building project?

The disadvantage of having a linear schedule for a multilevel building is that it will require to re-

develop the schedule all the time. It becomes extremely detailed that making the network difficult for

the user to visualize and manage even. The exact originals of graphical techniques are not clear and they

may have multiple original. As well, the limitation of linear scheduling method is that it assumes that

production rates are linear

Respond

M G

1. Discuss what resources are most critical for most of the construction projects and how to incorporate

the information into the schedule?

To complete an activity, the CM needs to ensure 3 elements are provided in a timely manner:

Human resources – Meaning the corresponding qualified team needs to enter the site at the intended

time.

Equipment – Either the appropriate team or the CM must procure the equipment that will facilitate .

This not only refers to the power tools used for a job, but also refers to scaffolding, safety gear etc.

Materials – Meaning the actual construction materials used to build. This goes from steel and concrete

to carpentry, flooring, and light fixtures.

Respond

2. Discuss one disadvantage that you see in using a linear schedule for a multilevel building project ?

While multilevel building projects are indeed quite predictable and repetitive, often they are filled with
detailing. Other projects that typically employs Linear scheduling , such as highways and roads are heavy

on structure but low on detailing such as interior finishes, carpentry etc.

An

s

wer

Discussion Question

s

1.

Discuss what reso

urces are most critical for most of the construction

project

s and how to

incorporate the information into the schedule

?

2.

Discuss one

 

disadvantage

 

that you see in using a linear schedule for a

multilevel

 

building

 project ?

An
swer

Discussion Question
s

1.

Discuss what reso
urces are most critical for most of the construction projects and how to
incorporate the information into the schedule?

2.

Discuss one

disadvantage

that you see in using a linear schedule for a
multilevel

building

project

?

Answer Discussion Questions

1. Discuss what resources are most critical for most of the construction projects and how to

incorporate the information into the schedule?

2. Discuss one disadvantage that you see in using a linear schedule for a

multilevel building project ?

Calculate your order
Pages (275 words)
Standard price: $0.00
Client Reviews
4.9
Sitejabber
4.6
Trustpilot
4.8
Our Guarantees
100% Confidentiality
Information about customers is confidential and never disclosed to third parties.
Original Writing
We complete all papers from scratch. You can get a plagiarism report.
Timely Delivery
No missed deadlines – 97% of assignments are completed in time.
Money Back
If you're confident that a writer didn't follow your order details, ask for a refund.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Power up Your Academic Success with the
Team of Professionals. We’ve Got Your Back.
Power up Your Study Success with Experts We’ve Got Your Back.

Order your essay today and save 30% with the discount code ESSAYHELP